Warehouse Floor Repair – Rhino Carbon Fiber Crack Lock

During construction, a crack had formed on this floor. The job schedule required the floor to be returned to service quickly and effectively, so as not to hold up the fit-up of the building. Conventional repair procedures using epoxies can be costly on materials and time.
Rhino Carbon Fiber Crack Locks offered an optimal solution. It offered a structural repair to the floor, and quickly, the whole procedure was done in a morning including setup time.
The repair is done just at the surface of the crack and not the full depth of the slab, so that you’re not indefinitely injecting epoxy into an unseen void or soils.

Project Details

Project – Warehouse Floor Repair
Location – Dartmouth, NS
Contractor – Techno Hard Surfaces
Material Used – Rhino Carbon Fiber Crack Lock

David Landry
Territory Manager
landryd@arrowco.ca
C: 902-717-0263

You are donating to : Greennature Foundation

How much would you like to donate?
$10 $20 $30
Would you like to make regular donations? I would like to make donation(s)
How many times would you like this to recur? (including this payment) *
Name *
Last Name *
Email *
Phone
Address
Additional Note
paypalstripe
Loading...